Standard Practices-Airframe
|
TTP |
B1-L1 |
ATA20 |
|
Beech 90 Series |
B2-L1 |
Standard Practices
Airframe |
TORQUE APPLICATION
• Nut and Bolt Tightening Information and
Standard Torque Values
• Installation of Locknuts
• Torque Wrenches
and Adapters
ELECTROSTATIC DISCHARGE SENSITIVITY
• Electrostatic Discharge Sensitivity Classification
ELECTROST ATIC DISCHARGE SENSITIVITY— MAINTENANCE
PRACTICES
• Removal/Installation of ESDS Equipment
• Handling of ESDS Components and Equipment
• Controlling Static Charge
Buildup
• Permanent Static Control
Workstation
•
Humidity and Dust Effects
on ESDS Components and Equipment
• Packaging of ESDS Components and Equipment
• Marking of ESDS Components and Equipment
•
Storage and Transit of ESDS Components and Equipment
ELECTRICAL
BONDING
• Electrical Bonding Methods
° Direct Electrical Bonding
° Indirect Electrical Bonding
• Electrical Bonding of Pipes, Tubing, and Conduit
• Electrical Bonding of Exterior Electrical Components
• Electrical Power Returns
CONTROL CABLES AND
PULLEYS
• Control Cable System Inspection
• Control Cable Tension
Inspection
• Control Cable Storage
• Control Cable Pulley Inspection
TUBE AND HOSE ASSEMBLIES AND FITTINGS
• Leakage
at Threaded Couplings
• Tube Manufacturing
• Tube Damage Limits
FASTENER LOCKING
DEVICES
• Self-Locking Nuts
° Slotted, Steel Locknuts (Prevailing Torque Type)
• Lockwire and Cotter Pin
Requirements
AIRCRAFT
FINISH CARE
• Aircraft Finish Cleaning
• Environmental Fallout (Acid Rain)
• Waxing Aircraft Finishes
• Placard Replacement
CORROSION
• Uniform Etch Corrosion
• Intergranular
Corrosion
• Pitting Corrosion
• Exfoliation Corrosion
• Electrolytic Corrosion
• Galvanic Corrosion
• Corrosion Prevention
• Corrosion Control
• Corrosion Cleaning
• Corrosion Protection
SEALING AND BONDING
• Surface Preparation for
Bonding
and
Sealing
• Sealer/Adhesive Preparation
|
PTP Beech 90 Series |
B1 |
LOC |
|
SGH |
|
|
|
|
B2 |
LOC |
|
SGH |
|
|
|
Comments
Post a Comment